Multi-Site Mining Comparator

Side-by-side fleet, productivity, cost, and D&B benchmarks across sites

MetricBest
Fleet
Excavators2.0
Trucks12.0
Drills4.0
Truck:Exc Ratio:16.0 :1
Production
Target MtpaMt30.0 Mt
Ore MtpaMt2.6 Mt
Waste MtpaMt27.4 Mt
Strip Ratio:18.2 :1
Exc Productivitytph2597.0 tph
Truck Productivitytph376.0 tph
Capacitykt/a12473.0 kt/a
Cost
Fleet CapEx$M62.6 $M
Annual OpEx$M23.9 $M
Cost per tonne$/t0.8 $/t
Drill & Blast
Hole Diametermm127.0 mm
Burdenm4.5 m
Spacingm5.2 m
Powder Factorkg/t0.2 kg/t
Pen Ratem/hr31.0 m/hr
Bench Heightm5.0 m
KPI
Availability%85.0 %
Utilisation%80.0 %
Op Hours/yrh/y5745.0 h/y
Trucks/hr25.0
Tonnes/op.hrt/h2165.0 t/h
Add more sites to compare. Click "+ Add Site" or "Import Excel" (one tab per site).