Side-by-side fleet, productivity, cost, and D&B benchmarks across sites
| Metric | Best | |
|---|---|---|
| Fleet | ||
| Excavators | 2.0 | |
| Trucks | 12.0 | |
| Drills | 4.0 | |
| Truck:Exc Ratio | :1 | 6.0 :1 |
| Production | ||
| Target Mtpa | Mt | 30.0 Mt |
| Ore Mtpa | Mt | 2.6 Mt |
| Waste Mtpa | Mt | 27.4 Mt |
| Strip Ratio | :1 | 8.2 :1 |
| Exc Productivity | tph | 2597.0 tph |
| Truck Productivity | tph | 376.0 tph |
| Capacity | kt/a | 12473.0 kt/a |
| Cost | ||
| Fleet CapEx | $M | 62.6 $M |
| Annual OpEx | $M | 23.9 $M |
| Cost per tonne | $/t | 0.8 $/t |
| Drill & Blast | ||
| Hole Diameter | mm | 127.0 mm |
| Burden | m | 4.5 m |
| Spacing | m | 5.2 m |
| Powder Factor | kg/t | 0.2 kg/t |
| Pen Rate | m/hr | 31.0 m/hr |
| Bench Height | m | 5.0 m |
| KPI | ||
| Availability | % | 85.0 % |
| Utilisation | % | 80.0 % |
| Op Hours/yr | h/y | 5745.0 h/y |
| Trucks/hr | 25.0 | |
| Tonnes/op.hr | t/h | 2165.0 t/h |