DEFAULT VALUESPush from Commercial Parameters to update|

Process Plant Model

DEFAULT VALUESPush from Commercial Parameters to update|

Full mass balance: Crushing → Grinding → Cu Flotation → Zn Flotation → Tailings

LINKED PAGES:BlendIncr CapExCapEx LOMTMF/ClosureMining CostsConcentrate
LINKED:Blend Optimizer Incr CapEx CapEx LOM TMF/Closure Mining Costs
Throughput
2.64Mt/yr
Feed Rate
359 tph
Cu Metal
39kt/yr
Zn Metal
62kt/yr
Au Produced
39k oz/yr
Bottleneck
Ball Mill

Throughput

Annual Ore (kt)
Operating Hours
Mill Availability %
Crush Cap (tph)
SAG Cap (tph)
Ball Cap (tph)
Required: 359 tph | Max: 340 tph (Ball Mill) | 106%

Feed Grades

Cu Grade %
Zn Grade %
Au Grade g/t
Ag Grade g/t
P80 Crush (mm)
P80 Grind (um)

Recovery & Concentrate

Cu Rougher Rec %
Cu Cleaner Rec %
Zn Rougher Rec %
Zn Cleaner Rec %
Au Rec to Cu Con %
Ag Rec to Cu Con %
Cu Con Grade %
Zn Con Grade %
Overall: Cu 84.5% | Zn 79.9%

Mass Balance Flowsheet

ROM Feed
359 tph
100% rec
Crushing
359 tph
99% rec
SAG Mill
355 tph
99% rec
Ball Mill
354 tph
99% rec
Cu Rougher
348 tph
88% rec
Cu Cleaner
48 tph
96% rec
Zn Rougher
300 tph
85% rec
Zn Cleaner
34 tph
94% rec
Tailings
266 tph
100% rec

Cu Concentrate

Dry tonnes/yr:
154kt
Wet tonnes/yr:
168kt
Cu grade:
25%
Cu metal:
39kt
Au content:
39k oz
Ag content:
1.2M oz
Moisture:
8%
Overall Cu rec:
84.5%

Zn Concentrate

Dry tonnes/yr:
120kt
Wet tonnes/yr:
132kt
Zn grade:
52%
Zn metal:
62kt
Moisture:
9%
Overall Zn rec:
79.9%

Tailings

Dry tonnes/yr:
2.37Mt
Tailings Generated Per Year
YearOre (kt)Cu Con (kt)Zn Con (kt)Tailings (kt)Cumulative (Mt)
202618501088416581.66
2027224012910320083.67
2028264015212323666.03
2029264015012423668.40
20302640148125236710.76
20312640146126236813.13
20322640145127236715.50
20332640144129236817.87
20342640142130236820.24
20352640140131236922.60
20362380125119213524.74
203718509694166026.40
Cu in tails:
0.3%
Zn in tails:
0.66%
Solids %:
45%
Thickener UF:
55% solids
Filter cake:
85% solids

Capacity Utilization

Crushing
90% (400 tph)
SAG Mill
100% (350 tph)
Ball Mill
100% (340 tph)

Dewatering & Water Balance

Thickener UF %
Filter Cake %
Cu Con Moist %
Zn Con Moist %
Tails Solids %

Water Balance Assumptions → Tailings Env

Rainfall mm/yr
Evaporation mm/yr
TSF Area ha
Water Recovery %
Seepage Loss %
Water m³/t ore

Water Quality Assumptions → Tailings Env

pH
TSS mg/L
Dissolved Cu mg/L
Dissolved Zn mg/L
Arsenic µg/L
Selenium µg/L
WAD Cyanide mg/L
Sulfate mg/L

Multi-Year Production Plan

Edit throughput & grades per year — auto-feeds Incr CapEx + Production pages

YearOre MtpaCu %Zn %Au g/tCu Metal ktZn Metal ktAu koz
202627.043.827.4
202732.453.533.2
202837.963.738.5
202937.564.338.5
203037.065.038.5
203136.665.637.9
203236.466.237.9
203335.966.937.9
203435.567.537.3
203535.068.137.3
203631.462.033.6
203724.148.625.7
Total29.4 Mt407 kt735 kt424 koz
PROCESS PLANT MODEL - MASS BALANCE - CRUSHING - GRINDING - FLOTATION - TAILINGS

Inputs: Blend Optimizer → Plant Model | Outputs: → Incr CapEx (production) → TMF/Closure (tailings) → Concentrate/Smelter (Cu/Zn con) (production targets + capacity), Production, and Tax & Finance pages

Open Incr CapEx →
100%